资源类型

期刊论文 912

年份

2024 1

2023 55

2022 69

2021 65

2020 60

2019 56

2018 50

2017 64

2016 46

2015 46

2014 46

2013 39

2012 34

2011 41

2010 36

2009 21

2008 36

2007 28

2006 30

2005 14

展开 ︾

关键词

管理 21

工程管理 18

可持续发展 10

项目管理 8

风险管理 7

信息化 5

工程 5

建设管理 4

三峡工程 3

工程项目 3

技术创新 3

系统工程 3

CAN总线 2

个人热管理 2

仿真 2

供应链管理 2

军事工程建设 2

创新 2

区块链 2

展开 ︾

检索范围:

排序: 展示方式:

The origins of schedule management: the concepts used in planning, allocating, visualizing and managingtime in a project

Lynda M. BOURNE, Patrick WEAVER

《工程管理前沿(英文)》 2018年 第5卷 第2期   页码 150-166 doi: 10.15302/J-FEM-2018012

摘要: Getting the in the at the has always been a major organizational challenge. In ancient times this process seems to have been accomplished based on the scheme of arrangements being contained in the leader’s mind and instructions communicated verbally. Modern approaches to solving the twin challenges of first thinking through the ‘plan’ and then communicating the plan to the people who need to do ‘ ’ use sophisticated graphics, charts, diagrams, and computations. This paper traces the development of the concepts most project managers take for granted including bar charts and critical path schedules from their origins (which are far earlier than most people think) through to the modern day. The first section of the paper looks at the development of concepts that allow the visualization of time and other data. The second looks at the shift from static representations to dynamic modeling through the emergence of computers, dynamic calculations and integrated data from the 1950s to the present time.

关键词: time management     scheduling     CPM     PERT     Gantt     Critical Path     bar chart    

Development of a BIM-based holonic system for real-time monitoring of building operational efficiency

Alessandro CARBONARI, Leonardo MESSI, Berardo NATICCHIA, Massimo VACCARINI, Massimiliano PIRANI

《工程管理前沿(英文)》 2020年 第7卷 第1期   页码 89-103 doi: 10.1007/s42524-019-0037-0

摘要: In the wide context of facility management, several processes, such as operations, maintenance, retrofitting, and renovations, ensure that buildings comply with the principles of efficiency, cost-effectiveness, and indoor comfort. Apart from ordinary operation, facility management is responsible for the renovation of and long-term performance improvement of building facilities. In such a scenario, the cyber–physical system (CPS) paradigm with holonic architecture, which is the focus of this study, can successfully guide the operation management and long-term refurbishment processes of buildings. Analogous to the manufacturing field, the developed CPS maximizes holons’ self-configuration and self-organization and overall throughput effectiveness metrics to detect the best corrective actions toward system improvements. Consequently, suggestions and lessons learned from the evaluation of building efficiency are redirected to the building information model. Hence, the digital model acts as a repository of currently available equipment for operations management and the history of diagnoses that support decision-making during the maintenance, retrofitting, and renovation processes. Evidently, the repeated detection of a specific issue, which is unaffected by operations management, should be considered an opportunity to act and enhance the performances of existing building components. Similar to a goods-producing industry, the building management system developed in this study applies the aforementioned methodology to provide services related to indoor comfort and building health. This approach indicates that a method for automatic real-time diagnosis is tested in a case study consisting of a multi-use and large public building. The current paper, which is an extended version of the one presented in the Creative Construction Conference 2018, deepens the decision support tool and the supervision policy. Moreover, the developed system is contextualized by providing an example of use case and highlighting the step forward in the field of smart buildings.

关键词: BIM     building management system     cyber-physical system     facility management     holonic system    

Negative weights in network time model

Zoltán A. VATTAI, Levente MÁLYUSZ

《工程管理前沿(英文)》 2022年 第9卷 第2期   页码 268-280 doi: 10.1007/s42524-020-0109-1

摘要: Time does not go backward. A negative duration, such as “time period” at first sight is difficult to interpret. Previous network techniques (CPM/PERT/PDM) did not support negative parameters and/or loops (potentially necessitating recursive calculations) in the model because of the limited computing and data storage capabilities of early computers. Monsieur Roy and John Fondahl implicitly introduced negative weights into network techniques to represent activities with fixed or estimated durations (MPM/PDM). Subsequently, the introduction of negative lead and/or lag times by software developers (IBM) apparently overcome the limitation of not allowing negative time parameters in time model. Referring to general digraph (Event on Node) representation where activities are represented by pairs of nodes and pairwise relative time restrictions are represented by weighted arrows, we can release most restraints in constructing the graph structure (incorporating the dynamic model of the inner logic of time plan), and a surprisingly flexible and handy network model can be developed that provides all the advantages of the abovementioned techniques. This paper aims to review the theoretical possibilities and technical interpretations (and use) of negative weights in network time models and discuss approximately 20 types of time-based restrictions among the activities of construction projects. We focus on pure relative time models, without considering other restrictions (such as calendar data, time-cost trade-off, resource allocation or other constraints).

关键词: graph technique     network technique     construction management     scheduling    

动态蚁群算法在带时间窗车辆路径问题中的应用

刘云忠,宣慧玉

《中国工程科学》 2005年 第7卷 第12期   页码 35-40

摘要:

蚁群算法是近年来新出现的一种随机型搜索寻优算法。自从在旅行商等著名问题中得到富有成效的应用之后,已引起人们越来越多的关注和重视。将这种新型的生物优化思想扩展到物流管理中的带时间窗车辆路径问题,设计了一种动态蚁群算法,从数值计算上探索了这种新型蚁群算法的优化能力,获得了满意的效果。

关键词: 蚁群算法     带时间窗车辆路径问题     物流管理     动态    

时间—资源权衡协调问题的多目标优化决策模型

王先甲,万仲平

《中国工程科学》 2005年 第7卷 第2期   页码 35-40

摘要:

时间—资源权衡协调是以追求资源消耗费用极小和项目完工时间最短为目标,在满足项目工期要求下,根据项目活动时间的先后次序与可更新资源约束有效确定项目时间表。提出了一个具有资源约束问题的时间—资源权衡协调问题的多目标优化决策数学模型。在模型中,对相互冲突的项目工期与整个被消耗的资源费用是可权衡调节的。通过权衡协调和调节项目工期与整个资源消耗费用,得到了满足权衡协调关系的满意可行解,并给出了一个数值算例。此外,在对应于资源约束的Lagrangian松弛表示式中,给出了该二人对策问题的有关特性。

关键词: 项目计划管理     时间—资源权衡协调     多目标优化决策模型     项目时间表     Lagrangian松弛    

General expression for linear and nonlinear time series models

Ren HUANG, Feiyun XU, Ruwen CHEN

《机械工程前沿(英文)》 2009年 第4卷 第1期   页码 15-24 doi: 10.1007/s11465-009-0015-z

摘要: The typical time series models such as ARMA, AR, and MA are founded on the normality and stationarity of a system and expressed by a linear difference equation; therefore, they are strictly limited to the linear system. However, some nonlinear factors are within the practical system; thus, it is difficult to fit the model for real systems with the above models. This paper proposes a general expression for linear and nonlinear auto-regressive time series models (GNAR). With the gradient optimization method and modified AIC information criteria integrated with the prediction error, the parameter estimation and order determination are achieved. The model simulation and experiments show that the GNAR model can accurately approximate to the dynamic characteristics of the most nonlinear models applied in academics and engineering. The modeling and prediction accuracy of the GNAR model is superior to the classical time series models. The proposed GNAR model is flexible and effective.

关键词: linear and nonlinear     autoregressive model     system identification     time series analysis    

Run-time system based on LinSERCANS and Soft-PLC

Cunfeng KANG, Chong WANG, Chunmin MA, Xudong HUANG, Renyuan FEI

《机械工程前沿(英文)》 2009年 第4卷 第2期   页码 120-124 doi: 10.1007/s11465-009-0019-8

摘要: Soft-PLC with open architecture is the direction of development in industrial automation. This paper discusses the method of communication between the interface functions of LinSERCANS under RTLinux and the external library of Soft-PLC under Windows. Based on the API HOOK theory, the communication between the interface functions of LinSERCANS and the external libraries of Soft-PLC is set up and it solves the calling functions of dynamic link libraries in different operation systems. It is able to combine LinSERCANS with the Soft-PLC, and a run-time system is developed based on the interface technology of the serial real-time communication system (SERCOS) and technology of soft-PLC. This run-time system has been used in all electronic injection molding machines and works very well.

关键词: Soft-PLC     run-time system     LinSERCANS     dynamic link libraries    

Two-stage scheduling on batch and single machines with limited waiting time constraint

Zhongshun SHI, Zewen HUANG, Leyuan SHI

《工程管理前沿(英文)》 2017年 第4卷 第3期   页码 368-374 doi: 10.15302/J-FEM-2017034

摘要: This study addresses the problem of two-stage scheduling on batch and single machines with limited waiting time constraint; thus, the makespan is minimized. A mixed-integer linear programming model is proposed for this problem. Three tight lower bounds and a heuristic algorithm are developed. The worst-case performance of the proposed algorithm is discussed. A hybrid differential evolution algorithm is also developed to improve the solution quantity. Numerical results show that the hybrid algorithm is capable of obtaining high-quality solutions and exhibits a competitive performance

关键词: batch machine     flow shop     makespan     limited waiting time    

Analyzing construction safety through time series methods

Houchen CAO, Yang Miang GOH

《工程管理前沿(英文)》 2019年 第6卷 第2期   页码 262-274 doi: 10.1007/s42524-019-0015-6

摘要: The construction industry produces a large amount of data on a daily basis. However, existing data sets have not been fully exploited in analyzing the safety factors of construction projects. Thus, this work describes how temporal analysis techniques can be applied to improve the safety management of construction data. Various time series (TS) methods were adopted for identifying the leading indicators or predictors of construction accidents. The data set used herein was obtained from a large construction company that is based in Singapore and contains safety inspection scores, accident cases, and project-related data collected from 2008 to 2015. Five projects with complete and sufficient data for temporal analysis were selected from the data set. The filtered data set contained 23 potential leading indicators (predictors or input variables) of accidents (output or dependent variable). TS analyses were used to identify suitable accident predictors for each of the five projects. Subsequently, the selected input variables were used to develop three different TS models for predicting accident occurrences, and the vector error correction model was found to be the best model. It had the lowest root mean squared error value for three of the five projects analyzed. This study provides insights into how construction companies can utilize TS data analysis to identify projects with high risk of accidents.

关键词: time series     temporal     construction safety     leading indicators     accident prevention     forecasting    

Convergence to real-time decision making

James M. TIEN

《工程管理前沿(英文)》 2020年 第7卷 第2期   页码 204-222 doi: 10.1007/s42524-019-0040-5

摘要: Real-time decision making reflects the convergence of several digital technologies, including those concerned with the promulgation of artificial intelligence and other advanced technologies that underpin real-time actions. More specifically, real-time decision making can be depicted in terms of three converging dimensions: Internet of Things, decision making, and real-time. The Internet of Things include tangible goods, intangible services, ServGoods, and connected ServGoods. Decision making includes model-based analytics (since before 1990), information-based Big Data (since 1990), and training-based artificial intelligence (since 2000), and it is bolstered by the evolving real-time technologies of sensing (i.e., capturing streaming data), processing (i.e., applying real-time analytics), reacting (i.e., making decisions in real-time), and learning (i.e., employing deep neural networks). Real-time includes mobile networks, autonomous vehicles, and artificial general intelligence. Central to decision making, especially real-time decision making, is the ServGood concept, which the author introduced in an earlier paper (2012). It is a physical product or good encased by a services layer that renders the good more adaptable and smarter for a specific purpose or use. Addition of another communication sensors layer could further enhance its smartness and adaptiveness. Such connected ServGoods constitute a solid foundation for the advanced products of tomorrow which can further display their growing intelligence through real-time decisions.

关键词: real-time decision making     services     goods     ServGoods     Big Data     Internet of Things     artificial intelligence     wireless communications    

Damage identification in connections of moment frames using time domain responses and an optimization

《结构与土木工程前沿(英文)》 2021年 第15卷 第4期   页码 851-866 doi: 10.1007/s11709-021-0739-3

摘要: Damage is defined as changes to the material and/or geometric properties of a structural system, comprising changes to the boundary conditions and system connectivity, adversely affecting the system’s performance. Inspecting the elements of structures, particularly critical components, is vital to evaluate the structural lifespan and safety. In this study, an optimization-based method for joint damage identification of moment frames using the time-domain responses is introduced. The beam-to-column connection in a metallic moment frame structure is modeled by a zero-length rotational spring at both ends of the beam element. For each connection, an end-fixity factor is specified, which changes between 0 and 1. Then, the problem of joint damage identification is converted to a standard optimization problem. An objective function is defined using the nodal point accelerations extracted from the damaged structure and an analytical model of the structure in which the nodal accelerations are obtained using the Newmark procedure. The optimization problem is solved by an improved differential evolution algorithm (IDEA) for identifying the location and severity of the damage. To assess the capability of the proposed method, two numerical examples via different damage scenarios are considered. Then, a comparison between the proposed method and the existing damage identification method is provided. The outcomes reveal the high efficiency of the proposed method for finding the severity and location of joint damage considering noise effects.

关键词: damage identification     beam-to-column connection     time-domain response     optimization    

Sustainability of steel structures: towards an integrated approach to life-time engineering design

Raffaele LANDOLFO, Lucrezia CASCINI, Francesco PORTIOLI

《结构与土木工程前沿(英文)》 2011年 第5卷 第3期   页码 304-314 doi: 10.1007/s01709-011-0123-9

摘要: Nowadays, the construction sector is more and more oriented toward the promotion of sustainability in all its activities. The goal to achieve is the optimization of performances, over the whole life-cycle, with respect to environmental, economic and social requirements. According to the latest advances, the concept of sustainability applied to constructions covers a number of branches such as life-cycle costing, ecology, durability and even structural design. Several procedures and design tools have been implemented in the framework of international research. Indeed the current trend in civil engineering research is moving towards life-time engineering, with the aim to implement integrated methodologies to consider as a whole all the sustainability requirements according to time-dependent multi-performance-based design approaches. Following a general introduction of the concept of sustainability applied to constructions, this paper presents an overview of life-time engineering methodologies according to the current state-of-the-art. In particular the methods currently received by International Standards are discussed. A special focus is devoted to the durability design of metal structures with respect to the degradation phenomena able to impair the structural capacity over time. Finally a proposal towards an integrated approach to life-time engineering design of steel structures and needs for further advances are presented.

关键词: sustainability     life-time engineering     performance based design     durability     metal structures    

Modal analysis of acoustic leak signal in pipelines using time-frequency analysis

JIAO Jing-pin, FEI Ren-yuan, HE Cun-fu, WU Bin

《机械工程前沿(英文)》 2006年 第1卷 第2期   页码 146-150 doi: 10.1007/s11465-006-0013-3

摘要: It is important to analyze the propagation characteristics of guided waves in acoustic leak location in pipelines. In this paper, the acoustic leak signal is analyzed in the time-frequency domain. Based on the relation of time-frequency distribution of the acoustic leak signal and the dispersion curves of guided waves, the mode components of acoustic leak signals were obtained. The research can provide a guideline for the mode selection in pipeline leak location, and help improve the accuracy of leak location.

关键词: dispersion     selection     guided     research     time-frequency    

A super-element approach for structural identification in time domain

LI Jie, ZHAO Xin

《机械工程前沿(英文)》 2006年 第1卷 第2期   页码 215-221 doi: 10.1007/s11465-006-0004-4

摘要: For most time-domain identification methods, a complete measurement for unique identification results is required for structural responses. However, the number of transducers is commonly far less than the number of structural degrees of freedom (DOFs) in practical applications, and thus make the time-domain identification methods rarely feasible for practical systems. A super-element approach is proposed in this study to identify the structural parameters of a large-scale structure in the time domain. The most interesting feature of the proposed super-element approach is its divide-and-conquer ability, which can be applied to identify large-scale structures using a relatively small number of transducers. The super-element model used for time domain identification is first discussed in this study. Then a parameterization procedure based on the sensitivities of response forces is introduced to establish the identification equations of super-elements. Some principles are suggested on effective decomposing of the whole structure into super-elements for identification purposes. Numerical simulations are conducted at the end of this study. The numerical results show that all structural parameters can be identified using a relatively small number of transducers, and the computational time can also be greatly shortened.

关键词: numerical     effective decomposing     parameterization procedure     divide-and-conquer ability     time-domain identification    

Microenvironmental time-activity patterns in Chongqing, China

Yu ZHAO, Shuxiao WANG, Gangcai CHEN, Fei WANG, Kristin AUNAN, Jiming HAO

《环境科学与工程前沿(英文)》 2009年 第3卷 第2期   页码 200-209 doi: 10.1007/s11783-009-0010-y

摘要: An investigation using recall questionnaires was conducted in winter and autumn 2006 to evaluate the time-activity patterns in Chongqing, China. The average time spent in seven microenvironments (MEs) including outdoors, transit, living room, bedroom, kitchen, classroom/office, and other indoors were found to be about 3.5, 1.1, 2.5, 9.7, 1.4, 4.2, and 1.7 h per day, respectively. According to the results of a nonparametric test, the sampling period and day of week were significant for the variation of the time spent in all MEs except for transit and outdoors. The time budget was analyzed using a general linear model (GLM), which exhibited significant variability by demographic factors such as gender, age, residence, education, and household income.

关键词: time-activity patterns     microenvironment     general linear model (GLM)     Chongqing     China    

标题 作者 时间 类型 操作

The origins of schedule management: the concepts used in planning, allocating, visualizing and managingtime in a project

Lynda M. BOURNE, Patrick WEAVER

期刊论文

Development of a BIM-based holonic system for real-time monitoring of building operational efficiency

Alessandro CARBONARI, Leonardo MESSI, Berardo NATICCHIA, Massimo VACCARINI, Massimiliano PIRANI

期刊论文

Negative weights in network time model

Zoltán A. VATTAI, Levente MÁLYUSZ

期刊论文

动态蚁群算法在带时间窗车辆路径问题中的应用

刘云忠,宣慧玉

期刊论文

时间—资源权衡协调问题的多目标优化决策模型

王先甲,万仲平

期刊论文

General expression for linear and nonlinear time series models

Ren HUANG, Feiyun XU, Ruwen CHEN

期刊论文

Run-time system based on LinSERCANS and Soft-PLC

Cunfeng KANG, Chong WANG, Chunmin MA, Xudong HUANG, Renyuan FEI

期刊论文

Two-stage scheduling on batch and single machines with limited waiting time constraint

Zhongshun SHI, Zewen HUANG, Leyuan SHI

期刊论文

Analyzing construction safety through time series methods

Houchen CAO, Yang Miang GOH

期刊论文

Convergence to real-time decision making

James M. TIEN

期刊论文

Damage identification in connections of moment frames using time domain responses and an optimization

期刊论文

Sustainability of steel structures: towards an integrated approach to life-time engineering design

Raffaele LANDOLFO, Lucrezia CASCINI, Francesco PORTIOLI

期刊论文

Modal analysis of acoustic leak signal in pipelines using time-frequency analysis

JIAO Jing-pin, FEI Ren-yuan, HE Cun-fu, WU Bin

期刊论文

A super-element approach for structural identification in time domain

LI Jie, ZHAO Xin

期刊论文

Microenvironmental time-activity patterns in Chongqing, China

Yu ZHAO, Shuxiao WANG, Gangcai CHEN, Fei WANG, Kristin AUNAN, Jiming HAO

期刊论文